Services

Zoo to Paoli Electrification Transmission Line

The Project upgrades Amtrak’s aging and inaccessible 138 kV transmission infrastructure by relocating it within the Amtrak right-of-way and installing a modern 6.9 kV signal power system to improve reliability and capacity.

Sawtooth Bridge Replacement

The Project will eliminate a major bottleneck on Amtrak’s Northeast Corridor by replacing more than a mile of aging viaducts in Kearny, NJ, originally constructed in 1907.

Newark Liberty International Airport – NEC Access Station

The project involves supporting the design of a new Northeast Corridor Access Station at Newark Liberty International Airport by implementing smoke management strategies for safe access to the existing EWR Rail-Link Station.

Excavation and Below Grade Construction of the OH-007 Gowanus Combined Sewer Overflow Abatement Facility

The project is the second phase of constructing a Combined Sewer Overflow (CSO) facility at the Gowanus Canal Outfall OH-007 as part of a federally mandated Superfund cleanup.

Kensico to Eastview Connection

The project involves constructing a 2-mile, 27-foot diameter deep rock tunnel to convey drinking water from Kensico Reservoir to the CDUV Facility in Eastview, enhancing system reliability and allowing maintenance without service disruption.

Rehabilitation of the HVAC Systems at the Hugh L. Carey Tunnel and Queens Midtown Tunnel Service Buildings

The project involves the full rehabilitation of HVAC systems at the Hugh L. Carey Tunnel and Queens Midtown Tunnel service buildings, including replacement of rooftop units, boilers, ductwork, and obsolete infrastructure, as well as hazardous material abatement and roof restoration.